First White Cloth Hall Timber Repairs

Structural timber repairs involving knitting back together a number of oak trusses which had been removed from this grade 2* listed building, dating back to the early 17,00's

  • Left derelict for years and at risk of collapse, parts of the structure were taken down
  • In 2019 works began to restore the building
  • Trace were asked to design and implement timber repair works to reinstate a series of oak trusses
  • Concealed GRP rods and resins were employed to reinstate whilst maintaining all of the historic fabric

Nineteen and one conifer timbers were takes and tested, this dated the time at which the timbers were grown from between 1366 to 1476, with the trees being felled in 1476, and likely being grown fairly locally. This was earlier than anticipated with building being opened in 1711.

Many of the trusses were simply in pieces and principally the work was to reconnect these sections of timber to reinstate them to the original form. This was achieved by carefully drilling and inserting glass resin polymer bars fixed with resins. It would not have been feasible with traditional repairs to reinstate without significantly affecting the appearance of the trusses.